PE pipeline repair program can be sawed off the pipe

Release time:2020-05-11 12:29viewed:times
PE pipeline repair program can be sawed off the pipe, after the water repair, PE pipeline is a good way to achieve permanent repair. PE pipe leaking after, shut off valves, cut off the damaged pipe material, but because of the valve is lax, or special circumstances limit, sometimes is not easy to break water clean, cannot make joint drying, this water can only use the following mechanical connection and flange connection to repair, if you can make the pipe damage without water dry, usable under mechanical connection, flange connection and fused to connect three ways to repair.
 
The first mechanical connection:
 
Put the stainless steel support sleeve inside the pipe and connect it with the special PE for water break repair developed by jiantubao plastic. This method is for permanent restoration. There are two kinds of internal support casing: fixed support casing and adjustable support casing. In the PE special emergency repair pipe fittings close to the sealing place with a section with groove back to the round pipe, its main role is to return to the round to restore the roundness of the pipe, but also to prevent the axial movement of part of the pipe. If the non-roundness of the pipe is not large, the internal support casing and the existing pvc-u pipe fitting of jiantubao plastic can be used to complete the repair.
 
Second flange connection
 
A group of PE flanges (PE flange joints and steel flanges) can be used for repair of small caliber PE pipes below dn110mm (including dn110mm). Flange connection can also be used for pipes above dn110mm, but the connection process is different from that of small caliber. Cut out the broken pipe section, but make sure the length is sufficient to meet the requirements of flange joint installation. Flange joint and the existing pipe material melt together, after measuring the distance within two flange joint, with reference to our company provide for welding steps, connecting the other two take back of the flange joint with a with the same diameter, the SDR and performance of existing tubing pipes, which are connected to the existing pipe in the form a match between the two flange joint assembly. After aligning, tighten the bolt and connect the assembly with the existing pipe. This results in a complete binding of constraints without the need to insert internal support and additional constraints.
 
The third: electric fusion connection:
 
This repair method is very similar to the flange connection repair, but the difference is that the use of different welding technology to form a permanent non-leakage connection, not using the butt welding method to weld the pipe and flange joint ends, but using the welding sleeve to connect the replacement pipe and the undamaged pipe ends. After the water is clean, the electric welding sleeve can be used for power welding. The current production specification of electric sleeve can reach dn800mm, the price is relatively high. This kind of connection is often used in gas pipeline repair.